Showing posts with label Palisades. Show all posts
Showing posts with label Palisades. Show all posts

Wednesday, December 12, 2007

Another Entergy Reactor Site LEAKING Tritium...NRC Promises To Help Cover It Up!

OK, we extrapolated based on the experience here at Indian Point that the NRC will help in a cover up of the newly found Tritium Leak at Entergy's Palisades reactor site, but you can bet money that Neil Sheehan will be running to the news media shortly claiming there is no immediate risk to the General Public of Michigan, and that Entergy is within their license allowances since the tritium has not left the site yet...sounds like a COVER UP TO US.

Radioactive substance found in well outside Palisades plant

December 12, 2007 - 3:10PM

COVERT (NEWSCHANNEL 3) - Entergy, the owner of the Palisades Nuclear Plant, has informed the United States Nuclear Regulatory Commission that a radioactive substance has been found in one of their monitoring wells.

The substance found was tritium, a radioactive isotope of hydrogen. It is often used in watch dials and exit signs that glow in the dark. Curious here...have you ever seen the lengths that the NRC goes to to retrieve missing exit signs? BUT, let a reactor leak tritium, and its fine.

The amount of tritium was relatively low, although over the limit allowed in drinking water. The water in the well is not used for drinking, so Entergy was not technically required to report the findings. A representative said that they made the report as a conservative measure. Entergy did make the county and local municipalities aware of the situation. This is the same bull shit response Entergy gives the citizens around Indian Point!

Wednesday, January 24, 2007

Relicensing Really A Two For One NRC Scam On Host Communities

The Nuclear Industry Wants to Steal The GREEN MANTLE, and Are Willing To Corrupt The Constitution TO DO IT, and The NRC and DOE Are GLADLY ON BOARD For The Ride.
If you begin researching the DOE, NRC, Idaho National Labs, nuclear industry plan for their perverted vision of a United States Nuclear Renaissance as found in the Nuclear 2010/GNEP road map, there are three MAJOR Mile markers. 2010 is the year that the DOE will push forward a singular Reactor Plan to the NRC that can be MASS PRODUCED. The second major point on the road is 2030...it is here, that the NRC expects to see the first in this new fleet of reactors finally increasing their current market share in the United States Energy Market. There is a catch...to reach this mile stone, it is imperative that all 103 currently operating commercial remain open and fully operational at PEAK CAPACITY.

To reach this 2030 goal, there is only one road that could and can be traveled. Streamline and corrupt the re licensing application process in such a fashion as to allow the NRC to get away with Rubber Stamping the applications, thus FORCING host communities to continue playing hosts to a brittling, aging, decaying group of 103 reactors...all in the name of keeping the Nuclear Industry alive. Problem is, the reactors are held together with 1,000's of welds and patches and reactor core crack, steam pipes burst, and domes begin to crack in preparation for potential cave ins. Environmental issues like proven degradation of our water ways are dismissed as minimal when compared to the benefits being received by the greater society (Corporate Executives and shareholders). Leaking spent fuel rod pools, a sure sign of structural instability are removed from the process under the guise they are NOT THE REACTORS...uhhh...are they NOT COVERED UNDER THE SAME LICENSE?

This national rape of local communities, the abomination of their environment, the game of Russian Roulette with their health is bad enough, but sadly, that is not enough for the DOE, NRC, the nuclear industry, and George W. Bush to accomplish their horrid crimes against humanity in trying to paint Nuclear as GREEN, clean, safe and secure. No, they need another 20 years, need to keep America's fleet of antiquated reactors running THROUGH 2050 when they are hoping they can have enough new reactors coming online to hold the line, and the profits of the industry. The third LEG of this axis of evil known as GNEP. As NRC rubber stamps the entire round of current applications, they have already started paving the wave for every single reactor to re license itself A SECOND TIME, have already started seeding the public with their demon spawn lies that these Nuclear Holocaust in waiting reactors are perfectly capable of remaining in service for not 40, not 60 BUT EIGHTY YEARS!
Every citizen in America who lives within the shadows of these death towers needs to read Kathryn Casa's article, "Industry: Reactors Should Run for 80 Years". It seems, that the NRC plans to have their licensees enter a proverbial REVOLVING DOOR...as soon as all of them have received their first renewal, while the host communities are still devastated and shell shocked at the wrongful first re licensing, the NRC is going to kick these communities while they are down by starting an immediate SECOND ROUND OF RE LICENSING that will allow they facilities to operate for a total of 40 years BEYOND THEIR ORIGINAL LICENSES.
This is just one more in a long list of reasons why the Green Nuclear Butterfly is calling for a nationwide FEDERAL LAW to conduct a safety and security assessment of EVERY NUCLEAR FACILITY in America (including fuel processing/reprocessing plants), a law that would declare a moratorium on all re licensing activities, and preclude the granting of any new reactor licenses until the industry begins to put a serious dent in their every growing pile of NUCLEAR WASTES.

Tuesday, January 23, 2007

Energy Issues-Bush Claim That Nuclear is Safe and Clean

Imagine An NRC That CLOSED Unsafe, Aging Nuclear Reactors, Instead of Rubber Stamping Their Relicensing
The wrap up and dissection of George Bush's State of The Union Speech will now go on for hours as every little nuance is put under the microscope. Green Nuclear Butterfly is specifically concerned with Nuclear Industry, and energy issues here in America, and around the world. In his speech tonight, Bush spoke rather briefly on Energy, much of his words nothing more than reruns as he again called on conservation, drilling in environmentally sensitive areas, and his seeming favorite, split grass.

First thing that concerned me, was the tactical way he attempted to bring America with him in embracing the 2010 challenge...in short, cut our fossil fuel use 20 percent in the next ten years. It was sly...by embracing this slogan, he gets us by proxy to embrace the Nuclear Power 2010 initiative. Some might doubt this, but it is true, a trick advertisers have used time and again in selling us on a new concept or product. In short, he and his administration are doing some BRANDING WORK. You brand 2010 as good, and by default he moves the GREEN NUCLEAR ball down the field.

He basically ended his energy section of the speech with the claim that Nuclear is clean and safe...it is NEITHER. First, the time has come for Congress to pass a law that requires a safety and security assessments of every nuclear facility in the United States of America...this is a rallying cry, and one of the primary goals of the Green Nuclear Butterfly. Secondly, America needs a COMPLETE moratorium on all nuclear advancements, on any future reactors until such time as our government and the Nuclear Industry can prove conclusively that they can deal with, and safely store radioactive waste streams for a period of no less than 100,000 years. Until those involved with nuclear can deal with their waste streams in a honest, proven, safe, and secure fashion, the industry should be dead in its tracks, and Congress owes it to every American community now hosting a nuclear facility, and to those communities who could be forced to host a future nuclear facility to declare a moratorium until these waste streams are dealt with, and removed from REACTOR SITES in totality.